Be.Smart Site Management
(EN) Site Management
(EN) Site Management
  • ℹ️What is Be.Smart Site Management?
  • βš™οΈRequirements
  • πŸ’ΎSupported file formats
  • πŸ†•What's new ?
    • Q1/2025 Release
    • Q2/2024 Release
    • Q1/2024 Release
    • Older releases
  • Getting started
    • Project set up in Trimble Connect
      • Create a project to Trimble Connect
        • Create a blank project (Trimble Connect)
        • Create a project based on template
      • User management in Trimble Connect environment
      • Project settings in Trimble Connect
    • Project set up in Autodesk Construction Cloud
      • Create a project to ACC
        • Create a blank project (ACC)
      • User management in ACC environment
    • Project set up in Site Management
      • Creating a project from Site Management
      • Site Management - Project configuration
        • Coordinate reference system
        • Measurement
        • Project location
        • Toggles
        • Coordinate formatting
        • AIS marine traffic
        • As-built tolerances
        • Application background maps
        • Background maps
        • Overlay maps
        • Default background map
        • Default models
        • Project links
        • Integrations
        • Connections
        • Permissions and Metadata
      • Settings for Site Management
  • Site Management
    • Project interface
      • Toolbar
      • Project tree
      • Map interface
    • πŸ“Measurement tool
    • πŸ“ˆElevation tool
    • βœ‚οΈSection tool
      • How to create a section
      • Measurements in sections
      • Breaklines in section
      • Print tool in a section
      • Export a section
    • πŸ–¨οΈPrint tool
      • Print tool options
    • πŸͺ¨Volume tool
      • Using volume tool
      • Reporting
    • πŸ“Inspect breaklines
    • ✏️Markings
      • Creating a marking
      • Editing a marking
      • Inspect markings
      • Filtering markings
      • Use-cases for markings
    • πŸ“ΈPresets
      • Creating a preset
      • Open a preset
    • πŸ—ΊοΈMap layers
    • πŸŽ₯3D viewers
  • Integrations and extensions
    • Site Productivity -integration
    • Machine Control -extension
      • Novatron/MOBA Xsite Manage
      • Leica ConX
      • Topcon Sitelink 3D v2
    • GeoView -integration
    • Utilization -extension
      • Utilization report
Powered by GitBook
On this page
  1. Site Management

Markings

Markings are transparent way of communicating with all the stakeholders in the project.

User can create different type of markings in Site Management. When a marking is created it is handled as a ToDo -task in Trimble Connect and as an Issue in Autodesk Construction Cloud. This for example allows to collect data about the progress of ToDo or Issue -tasks in the project. Site Management adds a locational information to the ToDos and Issues.

PreviousInspect breaklinesNextCreating a marking

Last updated 10 months ago

✏️